|
CAPPS Notes - August 21, 2002
I. Welcome
Cliff Lee reviewed the evacuation plan and notified the
attendees of the drill in mail room this morning.
II. Improper use of NOACs
Cliff indicated the Payroll Operations Branch has received
several calls regarding a variety of actions in suspense due to the agency's
inappropriate use of NOA's. These include:
A. 800 CGM
- Change in Data Element - There are more problems reported with
this NOA than others. This NOA is to be used only when certain fields
are changing. Those fields are: agency code, annuitant indicator, bargaining
unit status (BUS), FLSA category, occupational code (this one is being
used to convert the 334 to 2210), pay rate determinant, Personnel Office
ID (POI), and position occupied. If other CPDF data elements are also
changing with the personnel action, a NOAC 800 is not appropriate.
B. 792 - Change
in Duty Station - This NOA cannot be used if ANY other change is
occurring on the personnel action. Some agencies are trying to use the
792 for duty station changes that move the employee into a different
locality pay area. If locality pay is changing NOA 792 CANNOT be used,
we recommend using a "721-Reassignment". While OPM does permit
the use of "894-Pay Adjustment", we do not feel that it accurately
reflects that the duty station also changed.
1. Wanda Vaughan
(DOJ) - PACT did permit additional changes on the 800. A:
True, but these actions are causing packages
in old HCUP and EPIC History Corrections to fall into suspense and
they cannot be corrected because the items changing are not allowed
by the 800 NOA. In the case of NOA 800, PACT and the FESI systems
are allowing the use of the NOA inappropriately. Wanda felt that telling
the office to monitor the locality is confusing because the agency
is not used to doing the Locality Adjustments. A:
While it may be confusing to them, the servicing personnel office
has sole responsibility for knowing the implications of the personnel
actions they effect.
2. Mary Arnold (DOC)
- Can the agency process both the 792 (to change the duty station)
and the 894 (to reflect the locality pay adjustment) as a dual action.
A: No OPM's guidance clearly indicates
that the 792 is not to be used for "a change in duty station
when an employee's work site or station is moved to a new geographic
location that causes the locality pay to change" (OPM's Guide
to Processing Personnel Action, Update 25, dated December 12, 1997).
III. Benefits Update -
Jody Nyers provided an update on a variety of benefits that included:
A. TSP -
- Reimbursement letters were mailed
out the week of August 12th.
- Today's newspapers announced
that the TSP's new record keeping system is delayed until mid-November.
A press release from TSP is expected later today. To view the Press
Release, go to http://www.tsp.gov/curinfo/pressrel/NRKS-2002aug20.html.
- CSRS employees who have never
contributed to TSP have a blank Status Code in the payroll/personnel
system. This indicates that the employee is not eligible to participate
in TSP. Several employees in this category attempted to begin TSP
deductions during the open season only to receive an error message
indicating they were ineligible to participate. NFC South will perform
a sweep to change this code to "E - eligible". The sweep
is scheduled for PP-16. After the sweep, actions in suspense for CSRS
employees in TSP for the first time should apply.
B. Long
Term Care - The 1-800 number for employees overseas is available
on the OPM website. The number is accessible to 175 countries outside
the United States.
- Why apply for the Federal Long Term Care Insurance
during Open Season? There is abbreviated underwriting during this
Open Season (and no guarantee that any future Open Seasons will offer
such limited underwriting). Employees have to answer only 7 questions
about their health to apply for the 3-year or 5-year benefit period.
Their spouses, only answer 9 questions. And you can do this online.
(There are a few more questions if you apply for the unlimited benefit
period, and you cannot apply online for that option.)
- There is no guarantee when OPM
will offer another Open Season on the Federal Long Term Care Insurance
Program. According to the latest OPM guidance, "We will hold
future Open Seasons, but not on a regular or frequent basis. We don't
know when the next one will be."
C. Military
LWOP and FEHB Premiums - NFC North and
South are still working on the process for correcting this problem.
We hope to have a plan of action within the next couple of weeks.
- PPSPS has not been notified by every agency about
their decision to pay/not pay the FEHB premiums for employees who
are called up to for a military campaign. We are requesting agencies
who have made the decision to not pay to notify us. Please send an
e-mail to Cliff/Jody/Jo with this information.
- NFC is considering the use of a special remark on
the 473 Q3K ZJW for those agencies that make the decision not to pay.
This will eliminate the need for hard coding the value in the system.
In addition, it will eliminate the need for an additional process
for those agencies who have agreed to pay.
- Question from Mike Mire (TR)- Will the guidance issued
to CAPPS include what to do with those individuals who are already
on military furlough? A: Yes.
D. FEHB Health Care
Plan Amcare (ZX) is being discontinued in Oklahoma. BAL-02-208 dated
August 7, 2002, indicates that employees with Amcare in Oklahoma are
required to elect another FEHB plan to retain FEHB coverage. This is
an employee/agency responsibility to ensure that coverage is not lost.
IV. Employee Express Update
(George Morris) - The User Group met on August 20th.
A. The Washington National
Capital Area has agreed to participate in the CFC initiative for this
coming campaign season. The negotiations are still under way as to who
does what, but Employee Express does plan to have it resolved for this
open season. The Chicago and Denver areas are also being considered
for CFC participation.
B. Fall release testing
will be held the week of September 16th in Macon, Georgia. Treasury
and USDA are providing testers.
C. Implementation of
the EOD package is still being discussed. EEX is considering making
available those forms that have already been approved for use via Employee
Express now, rather than waiting for the full package to be implemented.
This would probably be in the Spring 03 release.
D. NFC is continuing
to move forward on its self-service package as well. The plan is that
NFC will offer everything that Employee Express offers within the next
12+ months, and this would allow NFC clients to discontinue paying for
and using EEX.
E. EEX has been approached
about flexible spending accounts and it is being considered.
F. Q&A:
Jennifer what is the status of the 16 allotments? A:
This change is scheduled for the fall release.
V. Status on Outstanding Items
- Rick Minella provided a status on the following:
A. Data Base
Expansion
- Testing Comments
- Glenda indicated that she is not getting feedback from the customers
on testing results. Even if you are only testing FOCUS, please let
Margaret's group or Glenda's group know how it went. Wanda did not
supply SSN's and therefore, they do not know which ones are loaded.
She has requested a listing of employees in the test data base. Ginny
said when she posed that question they were told to go into test PMSO
and run a POL
- Security Access Problems - Margaret sent Rick
an e-mail that said TR problem was fixed. Vickie indicated that not
all of their user's ids are working and that the problem has already
been forwarded to security. FOCUS reporting is the only area that
has been tested. The agencies are not sure if there's anything else
to test.
- Identification of New Fields - The listing
of expanded fields is available via FOCUS using NFCP.FOCS.listings.temp.
Glenda will provide pecific information about a request that you made
that is not there. Her number is 504-255-5386.
B. SF-113 A &
G Receipt Problems - it is our understanding that the June/July
reports have now been received. The August report is on schedule for
September 10th.
- Customers indicated there are errors on the report
each month. When it is pointed out, NFC fixes it on the current report
but the same errors appear the following month. NFC will only fix
it after the incorrect report is issued - therefore the programming
for the incorrect report is not being fixed.
- Cheryl Ruf (USDA) indicated that they cannot get
any report and they have talked to numerous people with no results
- all they need is the summary report and getting it is the most difficult
issue.
C. PKI Update
- NFC has been given a temporary certification to be a PKI site and
is in the process of negotiating with DOC for use of the certificates.
NFC is testing PKI in the Reporting Center area but is experiencing
problems when transferring the PKI to the production environment. A
more extensive update will be provided to the customers.
D. SF-50b Remark Printing
Problem - Examples submitted from DOJ and TR appeared to be limited
to FESI documents. The remarks need to be submitted with the proper
authentication date not the effective date. NFC believes the issue has
been resolved.
- DOJ has a recent case where remarks are not printing
and they do have the screen prints from EPIC. Examples were three
NOAC 170 documents. Two SF-50b's produced remarks w/comments and the
other did not. These examples were faxed to NFC South. All three actions
were processed on the Thursday that PAYE ran but before noon EST.
All were submitted within a 30 minute period. Rick indicated the batch
job runs in the evening so it should not matter what time these were
entered, especially since they were entered on the same day.
- DOC indicated that they submitted several examples
via the EPIC User Group where screen prints reflect the proper data.
This is not just a FESI issue. TREAS also had some examples which
will be sent to Rick so he can check on it and all of these. Q:
Do PACT users have remarks problems on 50's? YES - AOC indicated that
some days/worked for intermittent employees are not working from system
generated remarks. Non-system generated remarks are working ok.
VI. User & Work Group Updates
A. Awards
(Jo Bonner) - The user group met on Wednesday, August 14th, however,
only DOC and PSA were represented. One item scheduled to discuss was
the cancellation/correction process for awards. We can make decisions
for those who fail to participate; however, the customers must be prepared
to live with those decisions. The next meeting is scheduled for September
25th from 9 to 12 in the South Building..
B. EPIC (Lynda
Wilson) - The next user group meeting is on August 22nd at 10am. The
group will be discussing training and use of the training databases
since we have heard from many of the customers regarding the inability
to obtain security access to the training databases. We are documenting
the process and guidance will be posted on the website for users to
download and view/use.
- EPIC Transition Training
- a handout of scheduled training dates available for the remainder
of this year was distributed (click here).
These are 1-day sessions for experienced processors. If additional
sessions are needed, please let us know or request a special session
for your agency. Contact is Cynthia Simon at 504-255-5230.
a. Tom Neumeister
(SM) expressed concern that the transition training does not emphasize
the history correction process. Lynda advised that the EPIC Processing
Training was the appropriate training and there would be a definite
break to begin the History Correction portion of training. She
recommended that agencies send users to the segments of the EPIC
Processing Training that would meet their needs.
- EPIC Processing Training
- a handout of scheduled training dates available through December
2003 was distributed. If you have employees who need this training,
please call Louise Richard at 504-255-5418 to register. This class
runs 4 ½ days. A draft manual has been written which needs
to be finalized. Before attending this training, the processors should
attend OPM processing training so they will be able to participate
and understand the EPIC training. The EPIC training does NOT teach
employees how to do personnel work (i.e., what NOAC to use) or how
to operate in a Windows environment, it is for the knowledgeable processor
who needs to know how to maneuver in EPIC.
C. FESI (Rick
Minella) - Glenda and Hans have indicated that the pilot on suspense
file is going well at this point.
D. Leave Share
(Jo Bonner) - The next work group meeting is on August 22nd from 9am-1pm.
The Group is winding down. The reports (user and OPM) are almost completed
and the group is working on the form letters that will generate from
the system.
E. RIF (Debby
Berry) - The work group is waiting to hear from NFC South. Rick assigned
the package to an analyst for review. A web front-end will be developed
to handle the new operations, keeping the back-end as it is.
- Tom Neumeister (SM) asked if agencies could have
NFC sweep the system to eliminate all of the older performance appraisals
entered prior to 4 years ago because those appraisals are continuing
to show up on the retention register. Other clients also expressed
concern over having "old" ratings in the system. When the
agency does not have a current rating, a modal rating can be used
by the agency which allows for different percentages and factors,
etc., to compute a rating. While these ratings are appearing in the
RIF report, are they also being factored into the RIF standing for
employees?
POST MEETING UPDATE: Jo
reviewed the guidance in Title 5 (Sec. 351.504) and OPM's RIF training
manual (provided by USDA Graduate School). This guidance indicates
that all three ratings used in the RIF register process must have
been received no more than 4 years prior to the date of the specific
RIF notice.
- Q: Why are ratings
appearing on the IR304 out of sequence? A:
This is based on the sequence in which the ratings are entered into
the system.
POST MEETING UPDATE: Jody
received a fax from Tom reflecting the data on IR304 and how it's
posted to a RIF Retention Register. Jody faxed this information
to Rick who will provide it to the proper analyst for review.
F. T&A (Jo
Bonner) - The next user group meeting is on August 26th at 9am. Immediately
following the user group meeting the T&A requirements work group
will attempt to finalize responses to the questions from NFC South on
the March 2001 T&A requirements. The process may take a good part
of the day.
VII. SPPS
Training (Cliff) - Handouts on SPPS QA testing and Transition Training
were provided (click here). NFC is looking
for testers. If interested, please contact Sharon Giovengo at 504-255-5283
no later than September 13th.
A. Q: If you attended
phase 1 of SPPS transition training, do you need to attend this session?
A: YES.
B. Q: Which departments
are using SPPS Phase 1? A: DOC and part
of DOJ are using Phase 1.
C. Q: What is the status
of SPPS web? A: Implementation of the
next phase must coincide with the database change in October. After
that, the next phase will be to move the old block mode SPPS screens
and functionality to the client. We are also working to switch the customers
to the web. Payroll Operations already has much more functionality than
customers have. The block mode conversion will require that ten screens
to be switched over. Perhaps this can be done within in a couple months
and by then the web version will be available.
D. Q: Is it phase 3 that
will be webified? A: Only the functionality
available in the client version will be moved to the Web. Phase 3 will
come out in client server in October but will then be switched to web
platform (ex. QSRs). Phase 1 and 2 will also be available via the web.
E. Q: Is there a work
group in place for this? A: There is
no customer work group as the functionality is currently within the
Payroll Operations group who is providing the requirements. Vickie Cline
(TR) strongly encouraged Rick to ensure that the web version supported
PKI. Rick: Does everyone understand that using PKI will mean you will
need to purchase the certificate in order to use SPPS, if it is built
this way? One certificate per user per year can be used for all applications
that user accesses. It is still unclear as to what the current cost
will be for a PKI certificate.
VIII. TM063 - Contact Table
Jody provided a screen print of TMGT063 and the
values for each contact type.
A. Ginny Peck (TR) indicated
there is confusion at NFC South on the date to be entered into these
fields and which ones are needed. Other clients agreed that they need
some clear directions on what goes into each contact type. Rick indicated
that the confusion from NOLA on these fields may be because not all
of them are used by everyone in NOLA, if at all. Some of these were
established for Cliff's group and other groups. Jody will check the
guidance and provide additional information on the field values.
POST MEETING UPDATE: Jody
checked with TMGT and for the purpose of using one of the blank contact
types for Long Term Care contacts, those contact types (ie., 03 and
05) are no longer available. Jody will submit a request to open this
field once again. As for the other types, the explanation in the Table
Management Chapter of the PPM can be reviewed at http://dab.nfc.usda.gov/pubs/docs/tmgt/tmgt.pdf
on or about page 319. Jody will check on the usage of these tables by
various offices within NFC South. In the meantime, if you could access
the table and make necessary changes to each contact type, it will be
appreciated.
IX. Potpourri
A. Barbara Gales (SBA)
- TSP Bills were not anticipated. They only had 3 individuals for a
total of $810. Who do they call to complain? Q:
Please call Deidre Charlot at 504-255-5261.
B. Rhonda Hickey (SBA)
-
- Are agencies receiving their employee bills late,
due to late receipt of the bill due to mail delay's? YES. Vicki Cline
recommended that NFC change the timeframe. However, PPSPS pointed
out that the problem appears to be localized to the DC metro area
due to the additional screening and handling processes in place here.
- CULPRPT 049 - Summary of TINQ changes. It is not
picking up the factional hours. Nobody else has mentioned. Jo will
check into it and bring it up to the T&A User Group on Monday.
C. Wanda (DOJ)
Question on the 2PM version available on the web. The last update is
July 2000, but when you print the hard copy it shows a June 1995 date
on all pages. How do you know if the last update is included? The cover
should reflect the most current date for the latest update. Should have
an issue date and date of last revision. Copies were provided to Rick
to discuss with DAB.
D. Cheryl (USDA)
& Shavon (PSA) - Reporting Center is not being updated after BEAR
runs. You must review the "as of" date to ensure that they
have actually processed the load. It is not happening automatically
but someone need to run it. Rick now has this staff reporting to him
and has requested that they write the program to have it load automatically.
E. Vickie (TR)
- TR is about to send a huge FESI batch. She is going
to notify Milton and wanted to make sure that no one else required
notification. A: No.
- TR wanted to use Special Program Code "SH-summer
hire". Jody has that information but accidently provided it to
DOJ instead of TR. The bottom line is that NFC has lifted the FDIC
restriction, so it can be used by any customer. Jody emailed TR with
this information.
- TR has five agencies that cannot access any data
for the database testing. They are in the system, but have no access
to the data. Lynda said to call Lorraine Dawson 504-255-5813
to work through this issue. Pmain2, IDMS63, IRIS, and PMSO are the
required accesses for this. Clients requested that if there are "hidden"
items that need to be requested for SPPS testing, please tell them
up front to avoid security delays.
- Is disaster recover testing going on this week? Rick:
Yes, an abbreviated test is underway, but the users are not involved.
|